This week and last week the rough electrical has been worked on. Greg ran wire and placed the boxes last week and this week we built the light boxes for our ceiling lights and finished the rough electrical work. Tom, the owner, ordered an awesome exterior light that we drilled holes for the mounting location. The light reflects the industrial feel of the container and will look great out by the front porch. We are getting the main circuit box to mount on the container and the trench will be dug this week to connect the container electrical to the main house panel. After inspections and the hook up we will have power!! Then it’s on to insulation.
The project is moving forward nicely. We have been designing the interior look with materials and colors that we think will reflect the overall design intent.
Here is Greg pulling wire to a receptical box.
Sunday, June 28, 2009
Subscribe to:
Post Comments (Atom)
Who's that "hot" guy with the white sunglasses?
ReplyDelete