Saturday, June 13, 2009

Framing Finished!

Greg and I were very excited about the framing part of the project. We got the lumber and tools assembled and hit it hard. (As shown in the Photo of Greg attacking the wall with the framing gun.)
The back wall was then framed to separate the studio from the bike storage areas. In that wall we framed in 3 shelf nooks that mirror the 3 windows on the west wall.




The framing went relatively quick. We framed out each wall and attached the walls to the steel clips that will secure the wall to the container. (See clip photo)

We are now ready for the rough electrical.