A new rendering with the proposed color scheme. Just
threw this together a short while ago.






Today we had the spray insulation installed. Gale Insulation of Tucson installed Demilec foam insulation to the walls and roof cavity of the container. This type of insulation has the equivalent of an R-19 in a 3” cavity, being the perfect choice for our project. The installers taped off the doors and windows and opening and went to it.
After the foam set up, in about a minute, they shaved off the excess with large blades.
acceptable.
This week's progress was one word………HOT! The temps were up and the humidity was high. It was a scorcher.
We made progress with the landscape by the use of a small backhoe. Tom and his father came out and made short work of the electrical trench that needed to be dug from the house to the container. Then, with Greg pointing out the locations, boulders were placed on the site and arranged per the landscape design. There will be a nice gathering area where people can come together around a backyard fire pit and sit on the large boulders acting as seating. Tree holes were dug as well.
Here is Greg pulling wire to a receptical box.